[email protected] Serving Australian Industry
WPE 155-250 Double-Stage Worm Reducer | Ratio 1/900+ — Ever-power

WPE 155-250 Double-Stage Worm Reducer

First stage: 155 mm | Second stage: 250 mm | Max ratio: 1/900+ | Up to 6050 Nm | 462 kg

WPE 155-250 double-stage worm reducer

WPE 155-250 Double-Stage Worm Reducer

The largest double-stage worm reducer available. Deployed on major infrastructure dam gates, mining primary crusher feed systems requiring ultra-low-speed operation, and the heaviest industrial rotary equipment. At 462 kg, requires engineered foundations and crane installation.

155+250 mm
Centre Distances
1/900+
Max Ratio
6050 Nm
Max Output Torque
3.0-14.50 kW
Input Power
FG260
Cast Iron Housing
462 kg
Unit Weight
Double-StageFG260 Cast Iron Pre-AlignedUltra-Low Speed Multiple Variants (A/S/O/X/DA/DS)18-Month Warranty

Where the WPE 155-250 Is Deployed

The largest double-stage worm reducer available. Deployed on major infrastructure dam gates, mining primary crusher feed systems requiring ultra-low-speed operation, and the heaviest industrial rotary equipment. At 462 kg, requires engineered foundations and crane installation.

The WPE 155-250 pairs a 155 mm first-stage worm gear set with a 250 mm second-stage set in a single pre-aligned housing. For materials, construction details, and selection methodology shared with the single-stage range, refer to the WPA/WPS Series overview. For double-stage specific information, see the WPE Series overview.

Dimensional Drawing

WPE double-stage worm reducer dimensional drawing

WPE 155-250 Configuration Options

VariantConfigurationMotor Flange
WPEA 155-250Standard, input belowNo
WPES 155-250Input aboveNo
WPEO 155-250Output upNo
WPEX 155-250Output downNo
WPEDA 155-250Motor flange, input belowYes
WPEDS 155-250Motor flange, input aboveYes
WPEKA 155-250Hollow output shaftNo
WPEDKA 155-250Motor flange + hollow outputYes

Specify variant code when requesting a quote.

Need a Double-Stage Reducer Sized for Your Application?

Send us your output speed, torque, and mounting requirements. Sizing report within 24 hours.